05-01-2011, 08:51 AM
hi Rob
i took Stein's drawing and added some more track and scenery.
The minimum radius is 22", to get a wee bit more space around the tracks. The switches are #6 except some leading to spurs.
When operating i prefer at least 3 passing tracks. when running two trains at a time it is not only waiting for each other in the next station.
Smile
Paul
i took Stein's drawing and added some more track and scenery.
The minimum radius is 22", to get a wee bit more space around the tracks. The switches are #6 except some leading to spurs.When operating i prefer at least 3 passing tracks. when running two trains at a time it is not only waiting for each other in the next station.
Smile
Paul
