05-19-2011, 07:41 PM
Continueing on.....
The third trestle is installed.
As I think I said earlier, there is not much of my layout that is not elevated. There are three elevations and I hope to get a picture of one area that will have a train exiting a tunnel, with two trains passing overhead on two different elevations.
One of the tracks on the top level exiting the three trestle gorge area enters a station and industry area. This is shown here.
My next priority is to start building structures so I can begin to place them and work on the scenery.
As I said, it is a totally freelanced layout.....doesn't have a name yet. But I am sure something will develop.
The third trestle is installed.
As I think I said earlier, there is not much of my layout that is not elevated. There are three elevations and I hope to get a picture of one area that will have a train exiting a tunnel, with two trains passing overhead on two different elevations.
One of the tracks on the top level exiting the three trestle gorge area enters a station and industry area. This is shown here.
My next priority is to start building structures so I can begin to place them and work on the scenery.
As I said, it is a totally freelanced layout.....doesn't have a name yet. But I am sure something will develop.