SP&S Shelf Layout
Ok I got my switches in and have installed some more trackage. I have not been able to get past roughing in the switches as I need to drill holes and it seems the little one is always asleep when I have free time. This weekend I should be able to drill holes to my hearts content adn maybe do some wiring Cheers I need to get some power to the track before I loose interest and start on scenery... Misngth

This area will be where the Brooks Willamette particle board plant will be. It will hold between 3 and 4 cars. The track to the left will be for the woodchip loader.

[Image: Bend+59.jpg]
Be Wise Beware Be Safe
"Mountain Goat" Greg


https://www.facebook.com/mountaingoatgreg/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)