TPBO
Guess there's no substitute for actually being able to operate a proposed plan! Using what I'm calling version 2 of my plan, I've had to make some changes. Swapped two industries around and shortened the spurs serving them as it just looked like the more prototypical track lengths were overpowering the layout. So here's how it looks at this point:    
A little more operational testing and possibly another minor change or two and perhaps I can finally actually start building it!
Ed
"Friends don't let friends build Timesavers"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)