Southern Pacific Switching Layout
So this is an idea I am considering, It is based off one of my earlier designs, I know it looks bad at first with the switchback, but it is long enough where it adds to the operation rather than making it harder. I plan on adding an abandoned industry on the switchback lead.

The layout will use Micro-Engineering track with a 28" radius and #6 Turnouts code 70

[Image: SwitchingLayout-1.jpg?t=1311653718]
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)