Southern Pacific Switching Layout
So I think the first project I should work on is painting the backdrop, then I should glue down the foam sheets, then I can lay track. The foam and backdrop can get finished fairly soon, however it will take awhile to get all of the track down. I am thinking I could build the layout in stages, starting with the top part, that way I can get some trains running fairly quickly.

I am really excited about this layout, I hope I can build this layout until it is at least "Good Enough"

Here is the newest track-plan, It is not based on any prototypical location, and once again it is mainly just industry changes:
[Image: Layout3.jpg?t=1312339342]
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)