08-03-2011, 11:54 PM
Hmm.. Peco code 100 seems to have European spaced ties and it looks too "Toy-like" for a switching layout. I know I should get Pecos, but Micro-Engineering track look pretty good too. I just don't know how I feel about spending more than $150 on just turnouts.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
