Walther's New Steel Industry ~~ **Future Plans**
#37
Okay, so here is a drawling explaining what i mean in my last post

[Image: da16e94a.jpg]

This is backwards, but it was the only way i could do it

the GREEN is the TOP level which is 42" on top wall, 24" on left wall, 30" on right wall, and 30" on bottom wall. The BLACK is the MIDDLE level which is 30" on top wall, 26" on right wall, and 26" on bottom wall with the left wall being left blank and no benchwork for the second level there, and the TEAL/BLUE is the BOTTOM level which measures 24" deep on all 4 walls and also has a lift out for continuous running.

With that said, the levels would be secured to the walls on the backs of each level. On the front of each level's benchwork, there would be vertical supports running down to the ground.

So,

~~The GREEN level would be secured to the wall and have vertical supports running to the floor around the front edges of the top wall, right wall, left wall, and bottom wall sections of the benchwork
~~The BLACK level would be secured to the wall and have vertical supports running to the floor around the front edges of the top wall, right wall and bottom wall sections of the benchwork
~~And the TEAL/BLUE level would be secured to the wall and have vertical supports running to the floor around the front edges of the top wall, right wall, left wall, and bottom wall sections of the benchwork

Does this make sense?
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)