Southern Pacific Switching Layout
It wasn't the operations that were bothering me, it was that the area seemed too cramped and visually it looks a little too "artificial".

I plan on changing it to either an interchange track for when I run it as a short-line or a track leading to an "invisible industry" for when I run it as an industrial spur.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)