08-27-2011, 07:00 PM
Greetings all,
It's been way too long. I get almost no time to work on my layout so I haven't been able to get as far as I would like too. However, I locked myself in the basement for a few hours today to work on my latest project. I've never been happy with the capacity of my engine facility so I tore it out and moved it. I thought I would share some picas of my progress. First up is the beginnings of the new facility. You can see the old drawbridge to the right which gives you an idea of where this is now. From left to right is the Logan Yard East Lead, Main, RIP track, Enginehouse track#1, #2, #3 and the MOW track.
It's been way too long. I get almost no time to work on my layout so I haven't been able to get as far as I would like too. However, I locked myself in the basement for a few hours today to work on my latest project. I've never been happy with the capacity of my engine facility so I tore it out and moved it. I thought I would share some picas of my progress. First up is the beginnings of the new facility. You can see the old drawbridge to the right which gives you an idea of where this is now. From left to right is the Logan Yard East Lead, Main, RIP track, Enginehouse track#1, #2, #3 and the MOW track.
CandO7430 (The poster formerly known as IandOFan71)
T. Blackstone,
Division Superintendent,
Ohio Div, Chessie System Railroads
T. Blackstone,
Division Superintendent,
Ohio Div, Chessie System Railroads
