Southern Pacific Switching Layout
Turns out that I will need more flex-track than I thought, I have also been thinking that since I want reliability over looks I have been considering getting Peco code 100 turnouts, this will be cheaper since I have plenty of code 100 flex-track, and it will be more reliable.

I could also just get Micro Engineering code 83 turnouts since I still have some atlas code 83 track, it mostly depends on which ones operate better.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)