09-17-2011, 06:58 PM
So here are the two track-plans I am deciding between for the Rahway Valley Industrial Railroad(RVI)
1.![[Image: RVI-1.jpg?t=1316307008]](http://i844.photobucket.com/albums/ab4/Justinmiller171/RVI-1.jpg?t=1316307008)
Pros:
It is an entire short-line
Lots of room for scenery
interesting operation
Cons:
Stuck with modeling a short-line
Doesn't use some of my favorite rolling stock
2.![[Image: RVI-2.jpg?t=1316306955]](http://i844.photobucket.com/albums/ab4/Justinmiller171/RVI-2.jpg?t=1316306955)
Pros:
Uses all of my rolling stock
Includes some of my favorite industries
Able to model almost any railroad I want(Including a shortline)
Includes staging area
Cons:
Compressed
No interchange
Not as much room for scenery
1.
![[Image: RVI-1.jpg?t=1316307008]](http://i844.photobucket.com/albums/ab4/Justinmiller171/RVI-1.jpg?t=1316307008)
Pros:
It is an entire short-line
Lots of room for scenery
interesting operation
Cons:
Stuck with modeling a short-line
Doesn't use some of my favorite rolling stock
2.
![[Image: RVI-2.jpg?t=1316306955]](http://i844.photobucket.com/albums/ab4/Justinmiller171/RVI-2.jpg?t=1316306955)
Pros:
Uses all of my rolling stock
Includes some of my favorite industries
Able to model almost any railroad I want(Including a shortline)
Includes staging area
Cons:
Compressed
No interchange
Not as much room for scenery
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
