Southern Pacific Switching Layout
Stein has a excellent point and I will take it to the next step.

When I originally designed Slate Creek Industrial lead I designed it for C&HV,N&W, NS and CSX on a rotating operation plan but,there was another road in the shadows I been wanting to model for years-Southern Ry and I decided to add Southern to my 78-80 opration and decided that will be my primary road for that era with a C&HV and N&W operation when the mood hits..I am happy with this rotation plan since it gives me the roads I like-the Southern, N&W,NS and CSX with my C&HV has the odd man out.I can move into the 80s and use Southern,N&W and NS power as early post merger power.

Another idea I been toying with is back dating C&HV to 65/66 and have a 60 era operation ..However,that remains to be seen since I have 2 Santa Fe engines to cover that era and I will decide if I really want to go this route after Slate Creek is built.
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)