09-19-2011, 11:26 PM
Okay, I have settled with track-plan 1, I realised I could run it as a class 1 by staging the train on the interchange track.
I will be getting the track very soon, although I won't be able to actually lay track until I get the foam, since the hollow-core doors are to hard for tacs or track-nails to pierce.
I will be getting the track very soon, although I won't be able to actually lay track until I get the foam, since the hollow-core doors are to hard for tacs or track-nails to pierce.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
