Liberty Industrial Spur
#10
I have about 75% of the track laid, I was able to run a quick ops session using the only 4 cars I have that are equipped with metal wheels, it took me about 15 min to spot the 4 cars, Plus waiting for the brake-men and running at slow-speeds. I forgot what it was like to be able to run trains smoothly Big Grin
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)