10-11-2011, 12:42 PM
Hey Ed, a simple track plan means less headaches. A simple transload/team track along the front is a great way to reduce those headaches. I liked the earlier plan, but putting structures along the front edge can be a hassle that some don't have the time or energy for.
When the doc puts your decoder in, ask for one with DCC & Sound so that you can really screw with people's heads.
When the doc puts your decoder in, ask for one with DCC & Sound so that you can really screw with people's heads.
Mike Kieran
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.
