Small commuter focused layout?
#24
I used the Minories plan for one of my stations.
<!-- m --><a class="postlink" href="http://carendt.us/scrapbook/page85b/index.html">http://carendt.us/scrapbook/page85b/index.html</a><!-- m -->
It's about 8 feet long and a foot wide but it joins into a double track section of my layout and I use the big station as a fiddle yard for it. I also don't have enough suburban (commuter) trains in the same railway to run it properly -- the locos move from train to train and no longer match.
The operation is supposed to be train arrives, loco in stub track moves to back end and takes coaches out, ex-train loco moves to stub or directly to back of another train.
(There's an enlarged version with a couple of freight sidings).
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)