11-23-2011, 10:23 PM
FCIN Wrote:Both plans have a lot of switching involved, but I'm just not sure that I want to change everything (again!) at this point.
Don't worry about changing, I think it would definitely be worth it.
You could run the layout as a separate switching company without changing the track-plan by keeping the loco stored on the Peanut butter plan spur, similar to what the Kendallville Terminal does.
By the way, thank you for giving me the idea for a peanut butter plant, I would of never thought of it by myself.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
