L&N Industrial Rail Spur
Justinmiller171 Wrote:Don't worry about changing, I think it would definitely be worth it.
Well I'm still thinking it over at the moment, but for now I'm just going with the way I have the plan set up and see if it continues to keep me interested. Can't really see any gain with changing the plan as far as switching operations are concerned.
Justinmiller171 Wrote:You could run the layout as a separate switching company without changing the track-plan by keeping the loco stored on the Peanut butter plan spur, similar to what the Kendallville Terminal does.
Yep, but that would require having a runaround track on the left side of the plan in order to interchange traffic. Don't really want that at this point, but would be something to consider. If I did change the plan, then operating it as though it were at the end of a spur works just fine.
Justinmiller171 Wrote:By the way, thank you for giving me the idea for a peanut butter plant, I would of never thought of it by myself.
You're quite welcome. Very happy to see that one of the industries I've suggested from time to time has inspired someone to model it!
Ed
"Friends don't let friends build Timesavers"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)