12-04-2011, 06:09 PM
Micro Engineering also makes turnouts that are sprung, they have #6 turnouts in both code 70 and 83.
I have Peco code 100 turnouts and my layout, and I like them alot, but if you are going for street trackage code 100 may look a little bit too big.
I have Peco code 100 turnouts and my layout, and I like them alot, but if you are going for street trackage code 100 may look a little bit too big.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
