And I thought ExactRail was expensve!
#10
Do not forget to cover the full operating cost incl. labor, bank interest (or cost of capital if you are good on cash:-) and depreciation (how long will the expensive stuff work until it needs repair and replacement?). That should be planned for at least 3 years. A to optimistic estimate of the break even point is a common error.
The rolling stock is 370k$ worth. That needs a solid shed for protection, a 7/24h guard and a well balanced insurance incl. hurricane and flooding.
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)