01-12-2012, 06:33 AM
Ed wrote:Guess this is a good example of testing out things before committing yourself to a plan that looks good on paper, but doesn't work in reality. Going to have to think this over some more or else it's back to the drawing board!
-------------------------------------------------
Ed,I don't think track planing programs is all that acturate since I know you can have more then 3 switches on a 6' N scale ISL yet that's the most I can do with my current track planing program-its the same one you use-I'm on my daughter laptop and can't recall the name.I'll be glad when my computer is back up on line.
I'm finally moved and now have a 10' long wall to use for Slate Creek.Time I arranged everything it really ate the space and I ended up with excess furniture(this laptop does have spell check
)
I've decided to convert back to my old fashion plan as I build method when I build Slate Creek.
-------------------------------------------------
Ed,I don't think track planing programs is all that acturate since I know you can have more then 3 switches on a 6' N scale ISL yet that's the most I can do with my current track planing program-its the same one you use-I'm on my daughter laptop and can't recall the name.I'll be glad when my computer is back up on line.
I'm finally moved and now have a 10' long wall to use for Slate Creek.Time I arranged everything it really ate the space and I ended up with excess furniture(this laptop does have spell check
)I've decided to convert back to my old fashion plan as I build method when I build Slate Creek.
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!

