01-18-2012, 04:04 PM
I made up some falsework from scrap lumber left over from the benchwork and clamped it in place:
This should keep the track and roadbed rigid. Next steps are realigning and leveling the track, which wasn't damaged during the jigsawing but did get unspiked, and completing the cardboard lattice in this area in preparation for plaster cloth.
This should keep the track and roadbed rigid. Next steps are realigning and leveling the track, which wasn't damaged during the jigsawing but did get unspiked, and completing the cardboard lattice in this area in preparation for plaster cloth.