01-19-2012, 03:14 PM
The sidewalks are poured. Still need to do some leveling so the buildings sit flush with the ground. Also need to add more alcohol/india ink so the joints in the sidewalk stand out a little better.
![[Image: IMG_5554.JPG]](http://www.frontiernet.net/~tbohlen/IMG_5554.JPG)
Mike, thanks for the kind words.
Ralph, I pour the crossing with plaster of paris and then take a sureform and smooth it all out. Then take a hack saw blade and cut the flangeways.
Tom
Mike, thanks for the kind words.
Ralph, I pour the crossing with plaster of paris and then take a sureform and smooth it all out. Then take a hack saw blade and cut the flangeways.
Tom
Life is simple - Eat, Drink, Play with trains
Occupation: Professional Old Guy (The government pays me to be old.)
Dinosaur Rider
Occupation: Professional Old Guy (The government pays me to be old.)
Dinosaur Rider