Justinmiller171's 2012 Resolution Challenge
#18
Here is the plan I have had for the last few days, I will probably be changing the spurs alittle bit once I start laying track

[Image: 18x13ISL3.jpg?t=1327910965]

As you can see It is fairly basic, it uses only three turnouts and there is plenty of room to switch comfortably. I "borrowed" some of the industries from a few of FCIN's designs, these support about 90% of my rolling stock collection.

By the Deadline I hope to have track laid and have some basic mock-ups set up, If I get those done early I may have time to do some basic scenery also, but I shouldn't get my hopes up. I will try and take layout building slow this time so I can avoid frustration later, after my various layout attempts I have become decent at track-laying so I hopefully won't have any problems there.

I should be getting the doors in the next few days, once I get them put up I will be sure to take some pictures!
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)