02-04-2012, 04:02 PM
My goal for 2012 is to get the Bigger staging yard completed, this has been under construction for the last 4 years.There are gust 6 switch machines left to install and wire, 18 are already done. Although we have been operating on it for the last two years using manual control. Since Christmas I have gotten 4 machines installed and wired up, also built and wired the second control panel for it. Then decide on the next step, the Watrous staging yard or maybe some more scenery. :mrgreen:
Robert
Modeling the Canadian National prairie region in 1959.
Modeling the Canadian National prairie region in 1959.