02-22-2012, 10:03 PM
I have one in HO. It works well for the limited use I give it.
I think the N one is a slightly different design, with the points staggered instead of right opposite. For one of the curved routes, both points have to be thrown.
I think the N one is a slightly different design, with the points staggered instead of right opposite. For one of the curved routes, both points have to be thrown.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.