02-22-2012, 11:30 PM
I have an area I will b building soon in my nolix (modified helix with long stretches visible) in which I'd like to have three tracks side by side, to appear like holding sidings but really so I can stage two trains, not on the through track. This type of turnout would reduce the room needed for the sidings versus the traditional method of using two turnouts to achieve the same effect, but I'm hoping they aren't finicky and can handle a train "high balling" on the mainline.
