01-28-2009, 02:14 PM
Looks good, Josh, but you need some "scabs" between those piled pre-cast sections so that the operator can get the forks under the section which he wants to lift. Some basswood or styrene strips of an appropriate thickness will do the trick - of course, if you use styrene, paint it to look like wood.
Wayne
![Goldth Goldth](https://bigbluetrains.com/images/smilies/extra/goldth.gif)
Wayne