Freelance 2012
It is time to go back to the left side after the freight house kits arrived. The Cornerstone buildings are to wide for my layout. The middle section has been cut out. The space for trucks is also limited and four truck loading docks got closed.
I will leave it alone over night to give glue and paint time to set until I continue with details, ramps and weathering.

Daniel was with me yesterday. It was a pleasure to discuss lots of aspects of model railroading. Time passed by within seconds. He had lots of photos with him. I was and I am still totally amazed by a quite simple wall on a French layout. I did never see such a detailed and realistic old wall. Have a look at the left wall http://www.club-proto-87.com/crbst_pa_28...q0fq2f24p7

[Image: IMG_1368.jpg?t=1334336639]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 6 Guest(s)