05-01-2012, 06:35 PM
Hi Paul,
I am trying to stay away from more ambitious plans since I am on a small budget and I don't have much space.
I am also starting college in August so I won't have much time to work on the layout, I expect this layout to be a Summer Project.
My goal is to have track,wiring, and some scenery done by the time school starts.
I want to have the top staging since it provides destinations for the two other towns along the branch-line. The staging yard has two tracks representing the Mainline, and one track representing the L&N interchange at the end of the branch-line.
I am trying to stay away from more ambitious plans since I am on a small budget and I don't have much space.
I am also starting college in August so I won't have much time to work on the layout, I expect this layout to be a Summer Project.
My goal is to have track,wiring, and some scenery done by the time school starts.
I want to have the top staging since it provides destinations for the two other towns along the branch-line. The staging yard has two tracks representing the Mainline, and one track representing the L&N interchange at the end of the branch-line.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)