06-01-2012, 08:39 PM
HO scale for me, 'cause that's what I started with in the '50s. The layout is point-to-point-to-(eventually)-point, when I get around to building the partial second level. There is provision for a continuous run around-the-room, too, but that's mainly for the times my grandkids want to run trains.
I run DC and don't have (or miss) sound. The layout is designed to be operated sequentially by a single operator, so it's wired essentially as a single block with passing sidings.
Wayne
I run DC and don't have (or miss) sound. The layout is designed to be operated sequentially by a single operator, so it's wired essentially as a single block with passing sidings.
Wayne
