07-15-2012, 04:42 PM
Hello Blue.
I don't have much visible progress to report, most of the work has been gauging switches and fileing points. All the turnouts save 2 are now in place and the track tested for operation. All the yard switches are ballasted, and none are glued together. I followed Waynes advise and oiled the points, and I was very careful driping the glue on the ballast. I have about 75 feet of branch line to ballast and that will be done, then it will be all scenery and detailing.
Here are a few current pictures
Cheers!
Charlie
I don't have much visible progress to report, most of the work has been gauging switches and fileing points. All the turnouts save 2 are now in place and the track tested for operation. All the yard switches are ballasted, and none are glued together. I followed Waynes advise and oiled the points, and I was very careful driping the glue on the ballast. I have about 75 feet of branch line to ballast and that will be done, then it will be all scenery and detailing.
Here are a few current pictures
Cheers!
Charlie
