A Challenge: Designing A new modular layout section
#8
steinjr Wrote:Hi Koos --

I used Peco streamline code 75 medium turnouts - track plan drawing software was XtrkCad.

Smile,
Stein

Ok thanks. I've just played about with my trackplanning software (Empire Express, on the Mac), and made another version of your Weedpatch, CA layout.
I've used Peco Code 83 no'6 turnouts in my version. You will notice that in this version, I have included a small warehouse of GERN industries, in true Big Blue tradition, and you'll find that the silo's on the right now represent an industry that deals with sand.. ;-) (not sure why the trackplan doesn't show properly, so click on the image)

I might still tweak it a bit, but at the moment, I'm just looking at it and trying to visualise it. I'll keep you posted.
Cheers Koos
   
Be sure to visit my model railroad blog at <!-- m --><a class="postlink" href="http://www.namrr.blogspot.com">http://www.namrr.blogspot.com</a><!-- m -->
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)