07-21-2012, 10:50 AM
How do you intend to get from one level to another? How long are the trains to be? If the intention is to make it an industrial switching layout with trains limited to 10 cars or so, a train elevator might be what you need. The problem with a helix to move the trains from one level up to the next is that a decent helix will take up a lot of real estate.
