09-01-2012, 06:46 PM
With the track work the in place and quick overspary of brown I moved on to buildings.
The first building I worked on was the Haines Distribution this is an interesting building with its staggered front and small part that is where they unload railcars.
![[Image: Lelco4.jpg]](http://2.bp.blogspot.com/-0MWH-yKDNyw/UEAvI3fm9wI/AAAAAAAAA_s/HHBSCjN2wfU/s1600/Lelco4.jpg)
With the basic building figured out I turned my attention to the Lelco building.
The Lelco building is a farily large building with corugated metal sides.
Here is a picture with both buidlings in place
The first building I worked on was the Haines Distribution this is an interesting building with its staggered front and small part that is where they unload railcars.
![[Image: Lelco4.jpg]](http://2.bp.blogspot.com/-0MWH-yKDNyw/UEAvI3fm9wI/AAAAAAAAA_s/HHBSCjN2wfU/s1600/Lelco4.jpg)
With the basic building figured out I turned my attention to the Lelco building.
The Lelco building is a farily large building with corugated metal sides.
Here is a picture with both buidlings in place
