Building the Walthers N Coke Oven ~~ Start To Finsh
#3
The Coke Oven Walls have been sprayed a rust color while the Brick Oven Walls were sprayed the grey primer color.

[Image: Step6.jpg]

Oven Top has been sprayed a tan color and glued in place ontop of the oven walls. The Oven Top will be weathered with bits of brown, black, orange, and red colors and the walls will be weathered the same way.

[Image: Step6-1.jpg]

Step 7
The rest of the Oven Top has been glued in place.

[Image: Step7.jpg]

Step 8
Here is the top portion of the Coal Bunker which has been sprayed the rust color. The black part is where it will be sprayed an aluminum color as it is aluminum siding.

[Image: Step8.jpg]

Aluminum Siding sprayed.

[Image: 964ccbd7.jpg]

Added the roofs to the Coal Bunker. The opening is for the conveyor that will come from the Crushing House.

[Image: Step8-2.jpg]

Step 9
Supports for the Stairwell that will come from ground leveel up to the Oven Top.

[Image: Step9.jpg]

Step 10
Here is the stairwell that goes from the ground up to the top of the ovens. This is the unpainted pic.

[Image: Step10.jpg]

Here is the painted Stairwell. I sprayed it a bright safety yellow which will be weathered to look used.

[Image: Step10-1.jpg]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)