12-14-2012, 10:15 AM
That was exactly what I thought when I saw the pic and the revised building design. a covered walkway, or a walkway including some pipes and cable trays/ducts would work really well for this purpose. You could also do this with a covered conveyor, if loose materials such as grains or pellets are transported from one building to another.
-------------------------------
Why have the high maintenance equipment?
Here's the way I would do that based on my industrial observations.
Raw material arrives by truck to the production plant,then the product is transfered to plant 2 for finishing by trailer pulled by a yard tractor.A lot of companies use this method since it cheaper then maintaining a mechanical system..
-------------------------------
Why have the high maintenance equipment?
Here's the way I would do that based on my industrial observations.
Raw material arrives by truck to the production plant,then the product is transfered to plant 2 for finishing by trailer pulled by a yard tractor.A lot of companies use this method since it cheaper then maintaining a mechanical system..
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!

