01-23-2013, 10:50 AM
jwb Wrote:Reinhard, do you have a typical operating sequence that you could walk us through?
John, it is a very simple setup.
a. A "train" of up to four cars arrives at the small south side yard.
b. The engine does s run around if it arrived from the wet side
c. Ready cars are collected from the industries
d. New cars are distributed to the industries
e. Some collected cars may be temporary stored in the two stub tracks to be picked up later
f. The train proceeds in it's original direction to serve other industries.
The "fun" is that I try to run as best as I can according to the rules (GCOR). It takes at least 45 minutes to handle one train.
Reinhard
