01-26-2013, 06:42 PM
Still plugging away at this when I can. Installed another 8 foot section of framing tonight. The only annoying part is that I have to frame around some existing stuff which can make this time consuming. So I make my measurements, step back, take another measurement and then make my cuts. Plus the noise in the house is a factor, I have to be considerate ya know. I checked out the viability of getting a spray foam kit to do the cavities between the framing and found it to be too cost prohibitive. So If I am going to be doing any insulation it will be Roxul and plastic vapor barrier. Not much in the way of pictures as it looks like bare studs surrounded by a huge mess right now. I only have one more section to go, which will require more framing and more finesse getting around some existing stuff. Might get more done tomorrow, then I'll have some pictures to post.