03-28-2013, 10:51 AM
Time for another update, this time it's about the foundation for the roundhouse. Here's the underside, showing how the inspections pits are built to get some extra depth:
![[Image: 3032_w1200.jpg]](http://www.hjemstad.no/pics/2013/03/3032_w1200.jpg)
And here's the topside, work in progress. She has used cement based levelling compound with some gray paint mixed into it, the layer is about 1-1.5mm thick. You can see the guiding pins for the walls and divider wall posts. After the floor has been sanded and levelled out, it will be weathered for a more grimy and older look:
![[Image: 3045_w1200.jpg]](http://www.hjemstad.no/pics/2013/03/3045_w1200.jpg)
Svein
![[Image: 3032_w1200.jpg]](http://www.hjemstad.no/pics/2013/03/3032_w1200.jpg)
And here's the topside, work in progress. She has used cement based levelling compound with some gray paint mixed into it, the layer is about 1-1.5mm thick. You can see the guiding pins for the walls and divider wall posts. After the floor has been sanded and levelled out, it will be weathered for a more grimy and older look:
![[Image: 3045_w1200.jpg]](http://www.hjemstad.no/pics/2013/03/3045_w1200.jpg)
Svein