02-12-2009, 03:41 PM
I have made a new ramp, just working on the other side of it now. ill post some pics when i get it done. In the meantime:
Layed the first coat of the next section of Highway 10. I also put a second coat on the first section of Highway 10 i layed last night. Next to come is section 3 first coat, section 2 second coat, and section 1 third top coat followed by a tutorial on the WS Smooth-It and how i use it
![[Image: SL372486.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Highway%20And%20Switching%20Layout/SL372486.jpg)
Layed the first coat of the next section of Highway 10. I also put a second coat on the first section of Highway 10 i layed last night. Next to come is section 3 first coat, section 2 second coat, and section 1 third top coat followed by a tutorial on the WS Smooth-It and how i use it
![[Image: SL372486.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Highway%20And%20Switching%20Layout/SL372486.jpg)
