The second leg got installed. It got a custom connection to the belt conveyor of the wet/dry bin. This connection is like a "hand" on the bridge and the foot of the leg has two nails stick in the cork ground to ride on. That is a flexible mounting base convenient during assembly of the complex..
![[Image: file_zpsebb89bfd.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2013-2/file_zpsebb89bfd.jpg)
The second surge bin to be used for truck loading arrived today. The baseplate got modified to act as the truck unloading bin and got connected to the leg.
![[Image: file_zpsbd378722.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2013-2/file_zpsbd378722.jpg)
The components are connected via belt conveyors at the ground. The glue is still white... will set until tomorrow. Sorry, the bin connection are cheat only. I did plan to late for the ground conveyors and could not reach the bottoms of the wet and dry bin anymore.
![[Image: file_zpsebb89bfd.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2013-2/file_zpsebb89bfd.jpg)
The second surge bin to be used for truck loading arrived today. The baseplate got modified to act as the truck unloading bin and got connected to the leg.
![[Image: file_zpsbd378722.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2013-2/file_zpsbd378722.jpg)
The components are connected via belt conveyors at the ground. The glue is still white... will set until tomorrow. Sorry, the bin connection are cheat only. I did plan to late for the ground conveyors and could not reach the bottoms of the wet and dry bin anymore.
Reinhard