This week's ops
#15
Well, this week's ops are taking more than a week! I've been trying to be smart about my train sequences so sidings and spurs are cleared for future moves. An example of this is the way local train MK-4 (Mayfield to Kings Port) clears the float yard for a transfer run that will later fill up those float yard tracks.

MK-4 comes out of staging.
[Image: 001_zps968c3148.jpg]

The short local heads onto the main but soon the GP30 at the head end will be backing up to grab those four boxcars in the float yard.
[Image: 001_zpsd36cd6ec.jpg]

The loco couples up with the boxcars...
[Image: 002_zps2d73ba13.jpg]

...and pulls them out of the yard to hook up with the rest of the local.
[Image: 003_zps1d7e15bf.jpg]

...and heads on its way, later to be seen on the high line at Kings Port.
[Image: 008_zpsc913e375.jpg]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)