07-21-2013, 02:49 PM
One of the main things I had in mind in designing this layout was recognizing that in the real world, there's nearly as much scenery below track level as above it. I tried to keep this in mind while building much of the layout, so I could have the option not just for bigger bridges, but for smaller drainages and culverts. So here was my chance to add a couple of culverts to the Sunkist industrial track. I've cut rebates in the subroadbed to add commercial culverts.
