E-paw's kitbash summer '09 challenge
#1
Here we go now.I chose to bash a Walthers Carfloat apron in HO scale.It was a partially assembled (poorly) and damaged kit I picked up some time ago for a steal, Perfect kitbash fodder. I will have to "unglue" most of the kit somehow to get all the parts to line up properly. The Headhouse and steal pear will have to go,They will be back dated to some thing a little less modern looking. the apron rail will be electrified and a system for getting power to the barge will be added because I intend to move some small locos over the water also.    
Because of the nature of this bash I'll need to build it in place. So first up is to prep the layout where it is to be installed.    
That is the future site of the Susquehanna river. I first figured out the height of the "high water mark" and build the river bed from 1/2 inch ply wood. It was then covered with a layer of Durham's water putty and painted a dark green.    
 My other car is a locomotive, ARHS restoration crew  
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)