Scratchbuild - Another Bridge Project
#24
Started on the deck. Two layers of .060 styrene sheet, the bottom is cut to size, the top layer is just to raise the track up to the right level. Am adding on all the long deck boards with the blocking to support the walkway.

   
Three Foot Rule In Effect At All Times
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)