Scratchbuild - Another Bridge Project
I think DrWayne has done static grass. From my recollection, you need a pool of wet stuff -- diluted glue -- that you can stick one electrode in. So this may man the grass goes on as the step after the basic dirt.
Really, after doing that bridge, mere vegetation shouldn't be a problem.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)