Southern Pacific Switching Layout
#56
tetters Wrote:One small suggestion. Don't leave so much exposed wire on your track buss feeds to the UTP panel. You should only need to strip about an 1/8 of an inch of the insulation off in order to make your connection.

I think that could of been part of the problem, To fix it I switched it out with a different type of wire and that seems to have fixed it.

DCC makes model railroading more than twice the fun! I built a temp Inglenook switching puzzle and I have been shunting cars back and forth all day!
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)