11-07-2010, 09:11 PM
Galen, biL, Kevin, thanks! My goal all along has been to have an industrial type switching layout, so I knew it was going to be all flat for the most part, with structures being served by the railroad. I also want to include tons of details such as pallets, oil drums, trucks and trailers, junk, all kinds of industrial stuff that you see around buildings. At the conception stage, I had not planned to do a lot of prototype structures. Then an innocent trip into the industrial sector of Houston led me to the bridges, and from there, the scratchbuilds. And now that is going to lead to scratchbuilding many of the buildings around where I work. I'm happy with where this taking me.
Again, thanks to you guys for following along.
Again, thanks to you guys for following along.
Three Foot Rule In Effect At All Times